A renovated contemporary villa in Dubai at late afternoon, with a reflecting pool and mature olive trees

UAE villa renovation

Villa renovation in Dubai

We renovate villas across Dubai and the UAE, from one room to the whole house, approvals included. Tell us what you want done on WhatsApp and we come back with a price.

Get a quote on WhatsAppSee the pricesWe reply within five minutes
full villa renovation
FromAED 150,000full villa renovation
cosmetic refresh
FromAED 65,000cosmetic refresh
quote, with no obligation
Freequote, with no obligation

The numbers

Villa renovation Dubai: what does it cost?

These are the villa renovation Dubai prices we check every quote against: the bands UAE companies publish, what moves them, and what a written quote has to show before you sign anything.

What does a villa renovation cost in Dubai?

A full villa renovation in Dubai starts at about AED 150,000 for a basic three-bedroom fit-out and runs past AED 1,000,000 on a large villa with structural change. A light cosmetic refresh, paint, flooring and joinery with nothing moved, starts near AED 65,000. Design and build for part of a villa starts near AED 80,000. Those are figures UAE companies publish on their own sites, each one dated and sourced. The price guide breaks them down by scope and by villa size.

Which price bands do UAE companies publish?

Every figure in the table below is published by a company operating in the UAE, and each one is dated. We collect them because the single most common thing that goes wrong on a villa project is a homeowner who has no idea what the work is worth, meeting a contractor who does. One party in that conversation is negotiating blind.

Published UAE price bands for villa work, collected September 2026
ScopeWhat it coversPublished band in AED
Light cosmetic refreshPaint, new flooring, doors, joinery. Nothing structural, nothing moved.AED 65,000 to 300,000
Full villa renovationKitchens, bathrooms, MEP, finishes throughout. Layout may change.AED 150,000 to 3,000,000
Design and build, part of a villaOne or two rooms designed and delivered by the same firm.AED 80,000 to 150,000
Per square foot, all finish levelsThe unit most contractors price in.AED 100 to 1,200 per sq ft
Published UAE price bands for villa work, collected September 2026

Read the last row first. Contractors quote per square foot and then multiply, which is why two firms can hand you totals three times apart for the same brief. Their rates do not differ by three. Their assumptions about your villa's size and finish do. Ask for the rate and the area on every quote and the comparison becomes possible.

Send us the villa size and scope

Modern bright family room with light stone flooring and oak built-in shelves opening out to a lush lawn with palms

What moves the number?

Four things decide where in that band a villa lands, and only one of them is taste.

  • Whether walls move. A renovation that keeps the layout is a finishing job. The moment a wall comes out, the project acquires a structural engineer, a drawing set and an approval path, and the programme grows before a single tile is laid.
  • The services behind the walls. Rewiring, re-piping and replacing air conditioning are invisible in photographs and account for a large share of the cost. A villa from the early 2000s usually needs them. A villa from 2018 usually does not.
  • Bathrooms and the kitchen. They carry waterproofing, tiling, joinery and the most expensive fittings per square metre in the house. Count them before you compare two villas.
  • The community you are in. The same scope prices differently across Dubai, and the spread is wider than most people expect. The table below is Revive Hub Renovations' published figures, community by community.
Revive Hub Renovations' published whole-villa bands by Dubai community, September 2026
CommunityPublished band in AED
Jumeirah Village Circle, MirdifAED 75,000 to 160,000
The Springs, The Meadows, The LakesAED 110,000 to 220,000
Arabian Ranches, Dubai HillsAED 150,000 to 280,000
Jumeirah, Umm SuqeimAED 220,000 to 450,000
Palm Jumeirah, Emirates HillsAED 300,000 to 700,000 and above
Revive Hub Renovations' published whole-villa bands by Dubai community, September 2026

Treat that as one company's view rather than the market's, because it is. It is worth reading anyway: it tells you that a quote which ignores your community has not been thought about, and Dar Al Naseeb Engineering Consultants' community rates also put Palm Jumeirah and Emirates Hills at the top. Access, parking, permitted working hours and the developer's own rules are real costs to a contractor, and they show up in the price whether or not anyone itemises them.

What should a real quote contain?

A quote you can act on names the rate, the area, the finish level and what is excluded. A quote you cannot act on is a single number on a letterhead. The exclusions matter more than the inclusions: authority fees, developer NOC fees, waste removal, temporary power and the making good of anything the works damage are the five that most often arrive later as a variation.

  1. The rate per square foot and the area it is applied to.
  2. A finish specification, even a short one, so the rate can be judged.
  3. Who pays the authority submission and the developer NOC fees.
  4. The programme in weeks, and what happens to the price if it slips.
  5. The payment schedule tied to stages, not to dates.

We ask contractors for that shape before anything reaches you. If you would rather read the detail first, the cost page sets out each band with its source and the date we collected it.

Some villa projects are a single trade rather than a renovation, and each has its own page with the rules and published prices that apply: new windows, built-in wardrobes, gypsum designs, a leaking roof or smart controls. Structural jobs start from the plot rather than the finish, so an extension or a demolition begins with what the community allows. Once the work is done, yearly upkeep is priced as a contract of its own.

Scope

Three shapes a villa project usually takes

Cosmetic refresh

Paint, flooring, doors and joinery. The layout and the services stay where they are, so the programme is short and the approval path is usually the simplest one.

  • Nothing structural
  • Typically 4 to 8 weeks
  • Often no building permit

from AED 65,000

Full villa renovation

Kitchens, bathrooms, electrical, plumbing and air conditioning, finishes throughout, and a layout that may change. This is the job most people mean when they say renovation.

  • Services replaced
  • Structural change possible
  • Authority submission required

from AED 150,000

Design and build

One firm designs and delivers, so there is a single point of responsibility. It suits a villa where the plan is wrong rather than tired, and it starts with drawings rather than a price.

  • Drawings included
  • One contract
  • Suits layout changes

from AED 80,000

The interior of a renovated Dubai villa with travertine floors, a limestone feature wall and a garden view
FromAED 150,000full villa renovation

Why Corvana

We fix the part that goes wrong before the building starts

Most villa projects are decided badly in the first week. A homeowner with no idea what the work is worth meets a contractor who knows exactly, and every decision after that is made from behind. We close that gap. We track what UAE contractors publish, so we can tell you what your scope should cost before you speak to anyone. We write the brief, we put the same brief to contractors who work in your community, and we hold them to a rate, an area and a finish specification rather than a number on a letterhead. The building is carried out by licensed UAE contractors, which is where that work belongs. Getting you the right one, at the right price, is our job.

  • Every figure we quote carries the company that published it and the date
  • One written brief to every contractor, so the quotes are comparable
  • Free quote, with no obligation to proceed

How it works

Four steps, and you can stop at any of them

  1. Read the numbers

    Start with the bands above and the price guide, so you know roughly where your villa sits before we talk.

  2. Tell us the villa

    Size, community, how many bathrooms, and what you want changed. A message on WhatsApp is enough; there is no form to fill in unless you prefer one.

  3. We price it

    We go through the villa with you and send one written price: a rate, an area and a finish specification, not a single number.

  4. We build it

    You approve the price, we handle the approvals and our team does the work. One contract, one point of contact.

Where we work

Villa renovation Dubai rules, and how they change at each emirate border

The single most expensive mistake on a UAE villa project is starting work that needed an approval. The approval systems differ from one emirate to the next, and a contractor licensed in one is not automatically able to file in another. Each page below sets out the authority, the permit, the developer rules and what the market charges in that emirate.

Dubai

Dubai Municipality splits maintenance into tiers. Under Circular 3-12-1 of 2022, simple maintenance such as painting, changing floors, doors and suspended ceilings, and maintaining electrical, plumbing and air-conditioning works needs no permit and no completion certificate, but it must be carried out by a contractor accredited with the Municipality. Structural and specialised work goes through the Dubai Building Permits System instead. On top of that sits the developer: in Emaar communities an alteration needs a No Objection Certificate applied for through the community portal, and Emaar's published schedule sets one approval fee for minor works and a higher one for major works, with its review fee deducted from the total. Our Dubai page covers the tiers, the communities and the fees in full.

A spacious villa interior undergoing renovation with bare concrete floors, plastered walls, and covered materials

Abu Dhabi

A different authority and a different portal. Building and modification approvals run through the Department of Municipalities and Transport rather than Dubai Municipality, and the master-developer layer is Aldar rather than Emaar. Contractors who work across the two emirates keep separate registrations for exactly that reason. The Abu Dhabi page has the detail.

Sharjah

Sharjah handles a residential renovation through a maintenance permit issued by the Municipality's Inspection and Follow-up Section, with a refundable deposit that comes back once the site is cleaned, and anything structural needs approved engineering drawings and a building permit submitted by an accredited consultancy. The décor permit people often mention is for shops and industrial units, not homes. Ownership differs too. The UAE government portal states that non-nationals hold a usufruct of up to 100 years in areas the Government of Sharjah designates, while Alef Group advertises freehold to all nationalities at Hayyan, and no authority source reconciles the two. That decides who can commission work and on what terms, so the title deed is the first thing we ask for. Our Sharjah page sets out the path.

Ajman

Ajman publishes more of its fee schedule than its neighbours do. A maintenance permit is a named service with a stated fee, and it is open to individuals as well as to contracting companies, which is unusual in the UAE. Ajman does grade contractors and consultants into categories, and moving up a category is a named service at AED 200, though the categories themselves are not published. Our Ajman page explains what that means for a homeowner.

A villa project often reaches past the house itself. If the garden or the pool is part of the same programme, the same approach applies at Corvana Pools and Corvana Landscaping. If only one room is the problem, start at Corvana Kitchen Renovation or Corvana Bathroom Renovation. The full index of what we track sits at Corvana Renovation.

Get a quote for your villa

Modern two-storey villa with timber slats, a green lawn, and a potted olive tree against a distant city skyline

Your villa, priced in writing

Tell us the villa and what changes. We come back with one written price, and our team does the work.

Questions

What homeowners ask us first

How much does a villa renovation cost in Dubai?
A full villa renovation starts at about AED 150,000 for a basic three-bedroom fit-out and runs past AED 1,000,000 on a large villa with structural change. A light cosmetic refresh starts near AED 65,000. In per-square-foot terms the market publishes roughly AED 100 to AED 1,200 per sq ft depending on finish level. The price guide on this site breaks those bands down by scope and by villa size, with the source and date on every figure.
Do I need a permit to renovate my villa?
It depends on what you are changing. Under Dubai Municipality Circular 3-12-1 of 2022, simple maintenance such as painting, changing floors, doors and suspended ceilings, and maintaining electrical, plumbing, air-conditioning and firefighting systems requires no permit and no completion certificate, provided the work is carried out by a contractor accredited with the Municipality. Structural and specialised work is treated as a modifications transaction in the Dubai Building Permits System. Other emirates run their own systems.
What is a developer NOC and do I need one?
If your villa sits in a managed community, the master developer sets its own rules on top of the authority's. In Emaar communities any alteration to the villa has to be approved by Emaar through the community portal, and the NOC exists to confirm the works comply with the developer's guidelines as well as those of Dubai Municipality, the Dubai Development Authority and Dubai Civil Defence where applicable. Emaar's published factsheet sets approval fees for minor and major works and deducts its review fee from the total. Its permits portal states contractor working hours of 8am to 5pm on all days except Sundays and public holidays, with noisy work avoided between 1pm and 3pm. Emaar's 2026 villa rules are narrower, noisy work from 10am to 1pm and 3pm to 5pm, and we plan to those.
Why do two contractors quote totals that are three times apart?
Almost always because they are assuming different areas and different finish levels, not because their rates differ. Contractors price per square foot and multiply. Ask both for the rate, the area it is applied to and a short finish specification, and the two quotes usually turn out to be much closer than the totals suggested.
Who carries out the work?
We do. Corvana runs your villa renovation as the main contractor, with licensed trades for each part of the job under one contract and one price. Construction here requires the right trade licence, the right municipality classification and the right insurance, and the work is carried out by teams that hold all three.
How long does a villa renovation take?
A cosmetic refresh that moves nothing is typically a matter of weeks. A full renovation that replaces services and changes layout is a matter of months, and the approval path is often the longest item in the programme rather than the building work. Ask every contractor to put the programme in writing in weeks, and to say what happens to the price if it slips.
Which emirates do you cover?
Dubai is the main market and the deepest set of pages. We also cover Abu Dhabi, Sharjah and Ajman, with Ras Al Khaimah, Fujairah and Umm Al Quwain to follow. Each emirate page carries that emirate's own authority, permit path and developer rules, because they differ.
Can I renovate a villa I am renting?
Only with the owner's written consent, and that consent is a condition the authorities themselves impose rather than a courtesy. Dubai Municipality's own circular on self-permitting for decor makes the property owner's approval an explicit condition of the route that needs no building permit. In a managed community the developer will also want to see it before issuing any NOC. Get it in writing before a contractor prices the job, because a refusal at that stage costs nothing and a refusal after mobilisation costs a great deal.
Should I appoint a designer and a contractor separately?
Separately gives you an independent eye on the contractor's work and a drawing set you own. Design and build gives you one point of responsibility and usually a shorter programme, because the people drawing it are the people building it. Neither is automatically better. The question that decides it is whether your villa's problem is how it looks, in which case a contractor with a good finishing team is enough, or how it is laid out, in which case you want drawings before you want a price.
What happens to my details when I send a message?
Your enquiry stays with us and goes only to the licensed contractors who quote on it. We do not sell contact details to lists, and you can ask us to delete your enquiry at any time by replying on the same WhatsApp thread.

Who you are dealing with

  • OperatorWebsiteOS LLC
  • Licence2646567.01
  • QuoteFree
  • Figures datedSeptember 2026

Tell us about the villa

Size, community, how many bathrooms and what you want changed. We come back on WhatsApp with a written price.